Connecting SAP EWM MFS? Clarify these 16 questions first.

Practical check for logistics and IT managers

    Why now?

    Four typical triggers that operators of existing systems think about. Check which ones apply to your situation.

    ‍

    ‍

    This check makes no cost promises. It helps you clarify the prerequisites for connecting your PLC directly to SAP EWM MFS before you plan a project.

    The principle: the PLC does not notice the change

    The existing system control keeps running. Only the system behind it changes.

    ‍

    ‍

    Important: This is the target, not a guarantee. Prerequisites are clarified information, sufficient testing and an agreed cutover. The specific prerequisites depend on the system, the controller and the available interface documentation.

    Five typical stumbling blocks

    Five points that are often underestimated in connection projects.

    ‍

      How the self-test works

      16 questions in four areas. Answer every question honestly, ideally together with IT and operations.

      ‍

      Employee monitoring automated warehouse systems on screens in a control room

      Free assessment

      In the free assessment, we discuss your result from the 16-question check together and put the most important open points into context. You receive a first assessment of which points you should clarify before connecting your PLC directly to SAP EWM MFS.

      FAQ – Frequently asked questions about the connection check

      Do you have questions? The following FAQs summarize the most important answers. If your question is not covered, feel free to reach out to us directly.

      Who is the check for?

      For operators of existing systems who are checking whether SAP EWM MFS can replace their current control layer while the PLC stays unchanged.

      How does scoring work?

      You rate each of the 16 questions with 2 points (clarified), 1 point (partly clarified) or 0 points (open). A maximum of 32 points is possible, 8 per area.

      When is the overall rating green?

      From 24 total points, that is from 75 percent of the points. Green only applies if no individual area is rated red. If an area is in the red range despite 24 to 32 total points, the overall rating is yellow.

      Is the result a guarantee for the connection?

      No. The check makes no cost promises and gives no guarantee. Prerequisites for a direct connection are clarified information, sufficient testing and an agreed cutover.

      What do I discuss in the free assessment?

      In 30 minutes, we discuss your result from the 16-question check, the most important open points, possible technical and organizational risks, which information is still missing before a project decision and which next steps make sense for your system.

      Which areas does the check cover?

      Four areas with four questions each: Information, Technology, Testing and Organization.